![1](https://logi-tek.co.uk/wp-content/uploads/2019/09/1-705x519.jpg)
Major Investment Company – Hungary
Managed the commissioning and witnessed all new critical system and general MEP services. The fitout comprised of General Floor open offices, Client Meetings rooms, Critical Plant rooms and Comms Rooms
![2](https://logi-tek.co.uk/wp-content/uploads/2019/09/2-529x705.jpg)
Major Financial Institution – France
Two phase project acting as client-side commissioning agent, the project scope was to replace the chillers in the basement plant room
![3](https://logi-tek.co.uk/wp-content/uploads/2019/09/3-705x397.jpg)
Major Data Centre – Denmark
The project consisted of the construction and fit-out of a single Storey, 60 MW data centre
![4](https://logi-tek.co.uk/wp-content/uploads/2019/09/4-705x470.jpg)
Major Data Centre – Holland
The construction and fit-out of a single Storey, 60 MW data centre
![5](https://logi-tek.co.uk/wp-content/uploads/2019/09/5-705x396.jpg)
Major Data Centre – Belgium
The construction and fit-out of a 2 Storey, 60 MW datacentre. We acted as general contractor commissioning manager from Level 0 to Level 3
![6](https://logi-tek.co.uk/wp-content/uploads/2019/09/6-705x469.jpg)
Major Data Centre – Finland
60 MW, single story Data Centre, under NDA
![11](https://logi-tek.co.uk/wp-content/uploads/2019/09/11-705x470.jpg)
Major Financial Institution – Canary Wharf
This is an ongoing project for a French multinational investment bank and financial services cooperation
![14](https://logi-tek.co.uk/wp-content/uploads/2019/09/14-1-705x422.jpg)
Wellcome Genome Campus – Saffron Walden
Delivered the final quadrant of the existing on-site data centre and upgraded power supply resilience
![12](https://logi-tek.co.uk/wp-content/uploads/2019/09/12-705x529.jpg)
Tay House – Glasgow
Extended 3 no. standby Generator exhaust flues up the side of the building above the roof level and commissioned 3 no. Generators to prove diesel exhaust fumes discharge above roof level away from any AHU plant.
![10](https://logi-tek.co.uk/wp-content/uploads/2019/09/10-470x705.jpg)
Major Financial Institution – Canary Wharf
Fitness centre expansion and refurbishment, including reception space.
![7](https://logi-tek.co.uk/wp-content/uploads/2019/07/7-529x705.jpg)
Global Tech Giant – 6 Pancras Square
Fitout building to accommodate the technological giant, inclusive of running track, inter-connecting staircase, recording studios & wide open spaces incorporating advance lighting
![8](https://logi-tek.co.uk/wp-content/uploads/2019/07/8-564x705.jpg)
Major Financial Institution – Pinners Hall
Fitout of office floors within an existing building to accommodate staff moves. Including a café, reception, fitout floors and modifications to infrastructure
![9](https://logi-tek.co.uk/wp-content/uploads/2019/07/9-1-705x470.jpg)
Major Pharmaceutical Company – Ware
An in-depth condition survey of existing BMS system within a live environment
![credit-suisse](https://logi-tek.co.uk/wp-content/uploads/2019/07/credit-suisse-e1569510863605-705x702.jpg)
Major Financial Institution – Canary Wharf
Multi-phased fit-out of 10 No. floors along with major mechanical and electrical infrastructure upgrades
![raphael-tomi-tricot-HF8F-DMPVfE-unsplash](https://logi-tek.co.uk/wp-content/uploads/2019/07/raphael-tomi-tricot-HF8F-DMPVfE-unsplash-705x459.jpg)
Royal Albert Hall – Kensington Gore
Project management for BMS upgrades and major plant upgrade works. Co-ordination of maintenance shutdowns.
![13](https://logi-tek.co.uk/wp-content/uploads/2019/07/13-705x528.jpg)
Imperial War Museum – Lambeth Road
Investigative validation of existing mechanical and electrical services, followed by Fit-Out of back of house storage and office space.
![wells fargo](https://logi-tek.co.uk/wp-content/uploads/2019/07/wells-fargo-705x397.jpg)
Major Financial Institution – 33 KWS
Full building fitout of 9 floors plus roof, inclusive of trading floor, data centre, full reception, and interfacing with infrastructure
![17](https://logi-tek.co.uk/wp-content/uploads/2019/07/17-705x528.jpg)
Major Financial Institution – Canary Wharf
Various projects inclusive of moves and changes, the re-structing and supporting of internal structural walls and the decorating and redevelopment of the lower ground plant areas.
![OLYMPUS DIGITAL CAMERA](https://logi-tek.co.uk/wp-content/uploads/2011/12/19-705x529.jpg)
The Zig Zag Building – 70 Victoria Street
Our London-based Asset Management and Wealth Management Client moved to The Zig-Zag to provide employees with more modern facilities, bring the businesses closer to many of their clients and enable more efficient working practices.
![1cp-1](https://logi-tek.co.uk/wp-content/uploads/2011/12/1cp-1-1-705x362.jpg)
1 Churchill Place – Canary Wharf
The complete replacement and upgrade of 7 No. cooling towers for a British Multi-National investment bank and financial services company.
PORTFOLIO CATEGORIES
CONSTRUCTION ENQUIRER
- Graham consortium wins £400m Manchester job 26th July 2024 Grant Prior
- Morgan Sindall to build former Willmott Dixon leisure job 26th July 2024 Grant Prior
- Village centre approved for 6,000-home new town plan 26th July 2024 Aaron Morby
- Keltbray looking to sell infrastructure business 26th July 2024 Grant Prior
- Unite buys London site to fast-track 444-bed student scheme 26th July 2024 Aaron Morby
Business Hours
Telephone: +44 2031 460610
- Monday-Friday: 8:30 – 17:30
- Saturday: Closed
- Sunday: Closed
![](https://logi-tek.co.uk/wp-content/uploads/2020/07/CSA-logo-website.png)
![](https://logi-tek.co.uk/wp-content/uploads/2020/07/Covenant-logo-website.png)